Pilot obligations
What an awarded pilot has to do, build, assess and publish during implementation — gathered from the Call for Pilots Manuals and grouped by theme rather than by call section, so you can find an obligation by what it concerns rather than by where it appeared in the call text.
Reading the codes
Rq = requirement (binding) · Rc = recommendation (expected, not binding).
Codes differ between work strands. The interoperability self-assessment is Rq18 in WS2 and WS3, while Rq18 in WS1 covers MIMs Plus engagement. Always read the code together with your own work strand's column, and check the Call for Pilots Manual for the authoritative text.
Build
What has to exist by the end of the pilot.
| Obligation | WS1 | WS2 | WS3 |
|---|---|---|---|
| Interconnect two or more existing LDTs or data platforms | Rq2 | — | — |
| Develop a new common LDT addressing shared needs | — | Rq13 | — |
| Each public authority implements its own LDT instance (≥2 instances) | — | Rq13 | Rq13 |
| Provide management access to all 7 LDT layers | — | Rq13 | Rq13 |
| Deliver an advanced capability — predictive, prospective or prescriptive (WS3 adds diagnostic) | — | Rq15 | Rq15 |
| End-to-end traceability and proof of dependencies for all AI components | — | — | Rq33 |
The seven LDT layers
Each instance must give management access to:
- Data Sources Layer
- Data Acquisition Layer
- Knowledge Layer (ML/AI models, in WS3)
- Interoperability Layer
- Services Layer
- Orchestration Layer
- Visualisation Layer
These map onto the Base / Core / Surface levels used throughout the implementation guidance.
WS3 · AI components in the Marketplace (Rq27)
Unless using the LDT AI Notebook, AI models published to the Marketplace must provide:
- a deployable KServe package (Kubernetes via KServe, with InferenceService YAML);
- an accessible model artefact location (resolvable
storageUri); - a standard inference endpoint (V2-style API at
/v2/models/{model_name}/infer); - documented inputs, outputs and runtime (framework, version).
Interoperate
The technical commitments every pilot makes, whichever strand it is in.
| Obligation | WS1 | WS2 | WS3 |
|---|---|---|---|
| Semantic interoperability via a Linked Data ontology (MIM1) — NGSI-LD, LDES, SPARQL | Rq16 | Rq17 | Rq17 |
| Engage with at least 5 foundational MIMs Plus — MIM0, MIM1, MIM2, MIM3, MIM6 | Rq18 | Rq19 | Rq19 |
| Interoperability self-assessment, score ≥3 by project end | — | Rq18 | Rq18 |
| Deploy a SIMPL-Open Agent (Governance Authority Agent) | Rq14 | — | — |
The ISAQ is a condition for payment
Complete the Interoperability Self-Assessment Questionnaire during months 1–2 and again in the second reporting period. It is a predefined Pilot Deliverable, and a final score above three is a condition for payment. Submit the completed Excel file including all sheets.
The implementation guidance and the workflows show how these commitments translate into architecture and build steps.
Follow the methodology
| Obligation | WS1 | WS2 | WS3 |
|---|---|---|---|
| Work through the four methodology phases — EXPLORE → VALIDATE → DEFINE → IMPLEMENT | Rq13 | Rq12 | Rq12 |
| Structure the workplan around Pilot Deliverables PD1–PD5 | ✓ | ✓ | ✓ |
The methodology and its 15 workshops
Engage
| Obligation | WS1 | WS2 | WS3 |
|---|---|---|---|
| Engage end-users throughout the project lifecycle | Rq10 | Rq8 | Rq8 |
| Involve 3 of 4 quadruple-helix groups — public, private, research, civil society | Rq10 | Rq9 | Rq9 |
| Maintain up-to-date documentation for the consortium | Rq23 | Rq31 | Rq31 |
Share back
Openness is a binding commitment, not an aspiration.
| Obligation | WS1 | WS2 | WS3 |
|---|---|---|---|
| Publish open data models in open repositories under open licences | Rq23 | Rq28 | Rq28 |
| Contribute assets to the LDT4SSC Assets and Services Repository | Rq23 | Rq27 | Rq27 |
| Publish services to the EU LDT Marketplace | Rq23 | — | Rq27 |
| Document progress on the LDT4SSC Knowledge Hub | Rq23 | Rq31 | Rq31 |
| Provide a plan towards an open-source equivalent for any proprietary component | Rq23 | ✓ | ✓ |
The Assets & Services Repository is under development
It is not open for submissions yet — the LDT4SSC team will announce it when it is. The obligation still stands, so package and document as you go rather than waiting.
Where each kind of output goes
Sustain
| Obligation | WS1 | WS2 | WS3 |
|---|---|---|---|
| Establish a contractual framework guaranteeing LDT/service sustainability | Rq22 | Rq24 | Rq24 |
| Describe maintenance and expansion strategy beyond the pilot | Rq24 | Rq25 | Rq25 |
The Framework and Strategy for Growth and Sustainability sets out the conditions these obligations are designed to create, and maps 18 capabilities against these same codes.
Recommendations
Expected rather than binding — but they shape how a pilot is assessed, and several feed directly into the sustainability framework.
| Recommendation | Code |
|---|---|
| Assess LORDIMAS digital maturity — lead Digitally Optimised, others ≥ Moderate | Rc1 |
| Use open-source components and share enhancements back | Rc2 |
| Include IP and exploitation rights provisions in the consortium agreement | Rc3 |
| Technically establish a DCAT catalogue, a contextualised data management system (JSON-LD, RDF, NGSI-LD), IAM (OAuth2, OpenID Connect, Verifiable Credentials) and an ODRL-based data policy | Rc4 |
| Pursue alignment with the EU LDT Toolbox | Rc5 |
| Describe compliance with Gaia-X, IDSA, DSBA, DSSC Blueprint, DS4SSCC-DEP Blueprint | Rc6 |
| Record baseline data before start, for the Cost-Benefit Analysis | Rc7 |
| Assess eco-design maturity against the General Policy Framework for the Ecodesign of Digital Services — at least 30 highest-priority criteria | Rc8 |
Reporting
| Deliverable | When |
|---|---|
| Interim report — technical + financial | Mid-term |
| Final report — technical + financial | Within 30 days of conclusion |
| Certificate on Financial Statements (CFS) | Required if contribution ≥ €325,000 |
| ISAQ — first submission | Months 1–2 |
| ISAQ — second submission | Second reporting period |
Where the authoritative text lives
This page summarises obligations for day-to-day use. The binding wording is in the Call for Pilots Manual for your work strand — see the open-call archive.